New Trail Requests

The following are new trails or sidewalks that are under consideration. They are listed in alphabetical order and no priority has been assigned. The alignments shown are crude and only meant to illustrate the possible location of the walkway.

Abbotsford Connection

Bennington Woods Autumnwood curb cut

Bishopgate Connection

Creek Crossing Road 1

Creek Crossing Road 2

Difficult Run 1

Difficult Run 2

Fox Mill Road

International Center

Key West Raglan Connection

Lake Newport Road 1

North Shore Drive Cameron Crescent

Soapstone Drive 3

South Lakes Drive 1

South Lakes Drive 2

South Lakes Drive 3

Stratton Woods Park Connection

Westbriar Drive

END OF LISTINGS