Funded Sidewalk/Trail Projects
October 2011

# indicates change in completion date since last report

LOCATION DESCRIPTION STATUS EST COMPLETION
Beulah Road Bridge Add sidewalk during modifications to bridge over Dulles Toll Road Funding in process

TBD

Beulah Road Trail. trail from Coral Ridge subdivision trail to Meadowlark Gardens/Enterprise School.

complete

complete
Beulah Road Walkway asphalt sidewalk from Abottsford Dr to Coral Crest La and along Clarks Crossing Rd Design, addresssing design concerns with individual property owners. Jun 2013 #
Colts Neck Road W sidewalk on west side from South Lakes Drive to Hunters Woods Shopping Center complete complete
Fannie Mae link Extend existing Fannie Mae sidewalk to North Shore Drive providing connection to Plaza America Construction funded by Fannie Mae 2012
Fox Mill Road concrete sidewalk along south side from Fairfax County Parkway to Mill Heights Drive Construction
Feb 2012 #
Glade Drive concrete sidewalk along north side from Colts Neck Road to Shire Court Design Jul 2012 #
Gosnell Road concrete sidewalk on west side from Raglan Road to Tyspring St. Right of Way ?
Isaac Newton Square West upgrade and add asphalt sidewalk on west side from W&OD Trail to Sunset Hills Road.

Board approval

TBD
North Shore Drive concrete sidewalk along north side from Fairway Drive to Hickory Cluster Construction by developer 2012
Old Courthouse Rd add sidewalk on east side north of Route 123 Board approval TBD
Reston Avenue asphalt sidewalk along west side from Southington Lane to Shaker Drive Design May 2012 #
Reston Transit Station trail from Bluemont Way to W&OD connector trail on west side Construction Feb 12
Soapstone Drive walkway east side from South Lakes Drive to Snakeden Stream Valley Design May 2014
Soapstone Drive sidewalk on west side from Sunrise Valley Drive to Hunters Green Court Rigt of Way Jul 2012
Soapstone Drive Bicycle pavement marking plan from southern dead end to Sunrise Valley Drive complete complete
Sunrise Valley Dr. add curb-abutted sidewalk on south side from Soapstone Drive to South Lakes Drive Board approval TBD
Sunrise Valley Dr. upgrade asphalt sidewalk on north side from Soapstone Drive to South Lakes Drive Board approval TBD
Sunset Hills Road connection to W&OD Trail across from Plaza America Right of Way Issues Terminated
Sunset Hills Road concrete sidewalk north side from W&OD Trail to Michael Faraday Court Right of Way Jul 2012 #
Sunset Hills Road 8' asphalt trail and 6' walkway from west side of Town Center Parkway to existing sidewalk on north side of Sunset Hills Road. Also referred to as Reston Executive Center Design Sep 2011 #
removed from Hold
Trap Road Pedestrian bridge over Dulles Toll Road Construction summer 2012
Twin Branches Road west side from South Lakes Drive to existing sidewalk Reston Assoc. budget for 2012 TBD
Wiehle Avenue walkway west side from North Shore Drive to Baron Cameron Avenue Construction Apr 2012
Wiehle Avenue concrete sidewalk east side from existing sidewalk Chestnut Grove Sq to North Shore Drive Design Jan 2013 #
Wiehle Avenue upgrade to curb-abutted sidewalk on west side from Sunrise Valley Drive to station entrance Board approval TBD